Installation Guide
EZ2011 - END PKG, DOOR, EZ
BILL OF MATERIALS
DESCRIPTIONITEM CODEQTY
ID
BENCH FRAME, DOOR END, LHEZ100311
BENCH FRAME, DOOR END, RH
EZ100512
THRESHOLD, DOOR
EZ110713
HEADER, DOOREZ11101
4
PEAK, ENDEZ11241
5
PEAK SUPPORT, END, LH
EZ112616
PEAK SUPPORT, END, RHEZ11281
7
JAMB, DOOR, LATCH SIDE
EZ113118
DOOR, PREHUNG, 42.75 x 80, LHREZ113819
END CAP, GM2000GMSA51210
CARRIAGE BOLT, 5/16"x2-1/2", G5
NB1816211
WASHER, LOCK, 5/16" ZPNB1862212
WING NUT, 3/8" ZP
NB1901713
WING NUT, 5/16" ZP
NB1903214
WASHER, FLAT, NYLONNB1923
7
15
DOOR FRAME ASSEMBLY EZ2011
9
REV: AE-201007
6. Attach the Door (EZ1138), Door Jamb (EZ1131),
& (2) Door End Bench Frames (EZ1003, EZ1005)
to the PEAK / HEADER SUBASSEMBLY. (The
WIGGLE WIRE BASE on the PEAK / HEADER
SUBASSEMBLY should line up with the WIGGLE
WIRE BASE on the Bench Frames (EZ1003, EZ1005).)
7. Attach the Threshold (EZ1107) to the DOOR FRAME
SUBASSEMBLY using (2) Nylon Washers (NB1923)
and (2) 3/8" Wing Nuts (NB1901).
8. Set aside the remaining (2) End Caps (GMSA51), (5)
Nylon Washers (NB1923), and (5) 3/8" Wing Nuts
(NB1901) for now.
14
6
13
15
13
13
15
13
15
13
15
10
8
9
1
2
15
15
13
10
7
5
4
13
15
12
11
11
12
14
3
PEAK / HEADER
SUBASSEMBLY
8
9
2
1
DOOR FRAME
SUBASSEMBLY
13
15
10
10
15
13
15
13
15
13
15
13
15
13
15
13
3
DOOR FRAME
SUBASSEMBLY