Installation Guide

EZ2014 - FRAME CONNECTOR PKG, EZ
DETAIL C
(2 PLACES)
BILL OF MATERIALS
DESCRIPTIONITEM CODEQTY
ID
X-BRACEEZ1100
4
1
PURLIN, BASKET, 73 1/2"GM4000
32
SLIDE BAR, GM 2000GMSA52
23
ASSY, S.A. BOTTOM RAIL, 74"SA40132
4
ASSY, S.A. TOP RAIL, 74" (BROWN)SA4018
2
5
3'-0" x 55 1/4" 8MM CLR PCSSSS1005
46
CARRIAGE BOLT, 1/4"x 3/4", G5NB1820
47
WASHER, LOCK, 1/4" ZP
NB186048
WING NUT, 1/4" ZPNB190249
SNAPPER PIN, .250" x 2.25"NB1996210
C
CONNECTING THE FRAMES
14
REV: AE-201007
1
1
2
6
3
1
1
8
10
7
2
2
6
6
4
5
1
1
7
8
4
5
6
7
8
9
7
8
9
9
9
3
1
1
10
3. Install (2) X-Braces (EZ1100) on each interior side of
structure by alternately twisting braces into place onto
the hooks as shown.
4. Connect each pair of X-Braces (EZ1100) with a Snapper
Pin (NB1996) as shown.
5. Repeat steps 2 - 4 for each additional INTERMEDIATE
FRAME ASSEMBLY and END FRAME ASSEMBLY.
DOOR FRAME
SUBASSEMBLY
INTERMEDIATE
FRAME
SUBASSEMBLY
END FRAME
SUBASSEMBLY