Service Manual
Table Of Contents
- 2008 RANGER RZR SERVICE MANUAL
- GENERAL INFORMATION
- MAINTENANCE
- PERIODIC MAINTENANCE CHART
- COMPONENT INSPECTION / SERVICE LOCATIONS
- LUBRICANTS / SERVICE PRODUCTS
- MAINTENANCE REFERENCES
- GENERAL VEHICLE INSPECTION AND MAINTENANCE
- FUEL SYSTEM AND AIR INTAKE
- ENGINE
- TRANSMISSION AND GEARCASES
- COOLING SYSTEM
- FINAL DRIVE / WHEEL AND TIRE
- ELECTRICAL AND IGNITION SYSTEM
- STEERING AND SUSPENSION
- BRAKE SYSTEM
- ENGINE
- ENGINE SPECIFICATIONS
- ENGINE COOLING SYSTEM
- GENERAL ENGINE SERVICE
- ENGINE DISASSEMBLY AND INSPECTION
- Cylinder Head Assembly Exploded View
- Rocker Arms
- Push Rods
- Cylinder Head Removal
- Cylinder Head Inspection
- Cylinder Head Warp
- Valve Seal / Spring Service (On Engine)
- Cylinder Head Disassembly
- Valve Inspection
- Combustion Chamber
- Valve Seat Reconditioning
- Cylinder Head Reassembly
- Valve Sealing Test
- Cylinder Removal
- Valve Lifter Removal / Inspection
- Piston Removal
- Cylinder Inspection
- Cylinder Hone Selection and Honing Procedure
- Honing To Deglaze
- Cleaning the Cylinder After Honing
- Piston-to-Cylinder Clearance
- Piston / Rod Inspection
- Piston Ring Installed Gap
- Starter Drive Bendix Removal / Inspection
- Flywheel / Stator Removal / Inspection
- Engine Crankcase Disassembly / Inspection
- Camshaft Inspection
- ENGINE REASSEMBLY
- ENGINE INSTALLATION
- TROUBLESHOOTING
- ELECTRONIC FUEL INJECTION
- GENERAL INFORMATION
- FUEL TANK
- ELECTRONIC FUEL INJECTION
- ELECTRONIC CONTROL UNIT (ECU)
- TEMPERATURE AND BAROMETRIC AIR PRESSURE SENSOR (T-BAP)
- CRANKSHAFT POSITION SENSOR (CPS)
- FUEL INJECTORS
- FUEL PUMP
- FUEL PRESSURE REGULATOR
- THROTTLE POSITION SENSOR (TPS)
- ENGINE COOLANT TEMPERATURE SENSOR (ECT)
- IGNITION COIL
- GENERAL TROUBLESHOOTING
- EFI SYSTEM BREAKOUT DIAGRAMS
- Diagnostic Connector Circuit
- Malfunction Indicator Lamp (MIL) Circuit
- Fuel Injector (PTO) Circuit
- Fuel Injector (MAG) Circuit
- Engine Coolant Temperature Sensor (ECT) Circuit
- Engine Overheat Lamp Driver Circuit
- Crankshaft Position Sensor (CPS) Circuit
- Air Temperature and Barometric Air Pressure Sensor (T-BAP) Circuit
- Throttle Position Sensor (TPS) Circuit
- Fuel Pump Circuit
- BODY / STEERING / SUSPENSION
- CLUTCHING
- FINAL DRIVE
- TRANSMISSION
- BRAKES
- GENERAL SPECIFICATIONS
- TORQUE SPECIFICATIONS
- SPECIAL TOOLS
- BRAKE SYSTEM SERVICE NOTES
- BRAKE NOISE TROUBLESHOOTING
- HYDRAULIC BRAKE SYSTEM OPERATION
- BRAKE SYSTEM EXPLODED VIEW
- MASTER CYLINDER
- BRAKE PEDAL LEVER
- BRAKE BLEEDING / FLUID CHANGE
- FRONT BRAKE PADS
- FRONT CALIPER SERVICE
- FRONT BRAKE DISC
- REAR BRAKE PAD
- REAR CALIPER SERVICE
- REAR BRAKE DISC
- TROUBLESHOOTING
- ELECTRICAL
- General Information
- Switches / Controls
- Instrument Cluster
- Instrument Cluster Troubleshooting Tests
- All Wheel Drive Coil
- Gear Position Indicator Switch
- Speed Sensor
- Head Lights
- Tail / Brake / Work Lights
- Cooling System Schematic
- EFI Diagnostics
- Fuel Sender
- Relays
- Fuse Box Layout
- Fuses / Circuit Breaker
- Charging System
- Battery Service
- Conventional Battery
- Low Maintenance Battery
- Starting System
- Starting System Testing Flow Chart
- Electrical BreakOut Diagrams
- INDEX
- WIRE DIAGRAMS
3.56
ENGINE
Flywheel / Stator Installation
NOTE: Before assembly, clean the bolts and bolt
holes with Primer N (PN 2870585) to remove any
debris. This will ensure proper sealing when
installing bolts.
1. Install stator assembly (S) and bolts. Torque bolts to
specification.
2. Install the wire hold down bracket (T). Install two new wire
hold down bolts. New bolts contain patch-lock. Torque
bolts to specification, following the proper bolt torque
sequence. Coat the stator wire grommet (U) with Nyogel
Grease (PN 2871329).
NOTE: Verify stator wires are routed properly under
the wire hold down bracket.
3. Install the flywheel, washer, nut, and key. Torque flywheel
nut to specification.
4. Install stator housing with new o-rings. Torque the bolts to
specification and follow proper bolt torque sequence at the
beginning of this chapter.
Cylinder Head Reassembly
NOTE: Before reassembly, clean the bolts and bolt
holes with Primer N (PN 2870585) to remove any
debris. This will ensure proper sealing when
installing bolts.
1. Install the head gasket (A) on the cylinder (B).
2. Install cylinder head on cylinder.
= T
Stator Assembly Bolt Torque:
96 ± 3 in.lbs. (10.85 ± 0.35 Nm)
U
T
S
Replace 2 bolts with new bolts
65 ± 7 ft. lbs.
(88 ± 9.50 Nm)
= T
Flywheel Nut Torque
65 ± 7 ft.lbs. (88 ± 9.50 Nm)
= T
Stator Housing Bolt Torque:
96 ± 3 in. lbs. (10.85 ± 0.35 Nm)
96 ± 3 in.lbs.
(10.85 ± 0.35 Nm)
B
A