Shop Manual
Section 06 STEERING AND PROPULSION
Subsection 02 (iBR AND VTS)
smr2009-038-035_b
1. START/STOP switch
2. Wiring routed in slot provided in support
3. VTS/iS switch connector
4. Insert switch assembly in switch support.
5. Install steering cover, refer to
STEERING AND
O.T.A.S.
6. Carry out an operational test of the VTS and
iS systems to ensure proper operation of new
switch assembly.
406 smr2009-037