Installation Instructions
9/8/04
R.D. MW
710-01 7 Panel Built Installation
Rev. 01
5
4
3 2
4
diagram A
3
Wall Panel Installation
If the sauna is to be placed against existing wall(s), panel installation
should begin at these sides. After these panels are in place, the sauna can
be slid back towards the wall(s) keeping it 1/2” to 1” away.
All wall panels are numbered at the top and should be readable from the
interior of the room. These numbers will coincide with the numbers on the
base frame. NOTE: The tongue and groove on the panels will always face
the same direction.
5 Start your wall panel assembly in a corner. NOTE:
It is not always
necessary to install your panels in sequence according to their num-
bers
. Two wall panels make up each corner. Slide one panel along the
base frame until its 2x2 framework is flush with the outside of the base
frame (diagram A, panel 3).
NOTE:
For ease in installing the panels, tilt
the
top of each panel back to get the tongue and
groove alignment started . Then tilt forward for an easy fit.
6 Have someone hold the first panel in place and then put the other
corner panel on the base frame and slide it tight into the corner so its
2x2 framework butts up against the framework of the other panel (panel
4 from diagram A).
*There are 2 methods for fastening your wall panels ...
Exterior (Standard): To be followed when there is easy access to all
exterior corners of the sauna. See diagram B and follow steps 7A & 8A.
Interior (Alternate): When room was ordered as “Interior Install”. See
Diagram C and follow steps 7B & 8B.
7A Fasten the two panels together from the outside of the room using
3” torx screws. Holes are pre-drilled.
8A Install exterior, pre-assembled corner trim with provided #4
finishing nails. (photo E). NOTE:
One side of the groove has been
removed for easy installation.
7B Fasten the two panels together from the inside of the room using
3” torx screws. Angled holes are pre-drilled.
8B Install the removed interior tongue & groove using #4 finishing
nails. NOTE:
If exterior corner is exposed
install exterior, pre-as-
sembled corner trim with provided #4 finishing nails. (photo E)
D
3
4
4
3
Interior
Installation
Exterior
Installation
E
diagram B
diagram C
or