Instructions / Assembly

leaf relief
77
leaf relief
Installing Leaf Relief
®
on Half-Round Gutters
Wrap-Around Fascia Hangers
Lay Leaf Relief
®
 on gutter in front 
of hanger and mark location of 
bracket (see Figure 1).
Notch back of Leaf Relief
®
 as 
shown in Figure 2.
Firmly press back of Leaf Relief
®
behind gutter, and pivot down to rest 
on front lip of gutter (see Figure 3).
 Attach with screws through Leaf 
Relief
®
 and front lip of gutter every 
24˝ (Figure 4).
Continue installing Leaf Relief
®
panels, overlapping 1/2˝. As 
required, a screw can be inserted 
through overlapping panels to reduce 
sagging.
Spring Clip Bar Hangers
Lay Leaf Relief
®
 on gutter in front 
of hanger and mark location of 
bracket (see Figure 5).
Cut and notch Leaf Relief
®
 as shown 
in Figure 6.
Mark
45ϒ
45ϒ
Notch
Every 24"
Mark
Cut
Fig. 1
Fig. 2
Fig. 4
Fig. 5
Fig. 6










