Installation Guide
basic installation
transition procedures
Transition from Horizontal
to Vertical (Fig. 1)
Finish the last course of horizontal 
siding with the J-channel and 
finish trim. Install a drip cap and 
a J-channel. The top piece of 
J-channel must have minimum 3/16˝ 
(4.8mm) diameter weep holes drilled 
no more than 24˝ (610mm) apart to 
allow for water runoff.
drip cap
gap for 
drainage
Fig.1
48










