Installation Guide
frieze, rake and band boards
accessories installation
Lineals
Choose either a 3.5˝ or 5˝ lineal, 
depending on the look you want to 
achieve.
At Eave or Gable, butt the small leg 
of the starter against, but not under 
the J-Channel that was installed to 
receive the soffit.
Nail the starter in place every 8˝ to 
12˝ with nails centered in nailing 
slots. (Fig.1)
Push the locking leg of the lineal into 
the starter channel. 
Nail the Lineal in place every 8˝ to 
12˝ with nails centered in nailing 
slots.
Install utility trim into the lineal 
receiving channel, making sure to 
align nail slots with lineal nail slots.
Install last course of siding. (Fig. 2)
In some situations you may have to 
shim the utility trim or you can use a 
Double utility trim.
8" - 12"
8" - 12"
Fig.1
Fig. 2
35










