Installation Guide
11
estimating required material
how to measure
1. All houses can be broken down 
into shapes of rectangles, triangles or 
a combination of both.
2. The area to be sided can be deter-
mined by measuring the height and 
width of the house, including win-
dows (below).
3.  Total all of the measurements for  
the areas to be sided. Windows and 
doors are not usually deducted. 
Including them will provide an allow-
ance factor for waste. If the windows 
and doors are extremely large (such as 
garage or sliding glass doors), some 
deductions can be made. Dormers and 
gables are prone to material waste due 
to cutting and fitting.
4. To estimate the amount of starter 
strip required, measure the linear feet 
around the entire base of the house. 
When measuring linear footage, add 
a factor of 10 percent to allow for 
waste.
width
height
Height____feet x width____feet=____square feet
width
height
(
1
/
2 
height)____feet x width____feet=____square feet
A
D
C
B
1
/
2 
(A+B)xC+
1
/
2
BxD=___total area of gable
(square feet)
width
width
height
(
1
/
2 
height)____feet x width____feet =____total area of dormer
(square feet)










