Installation Guide
47
basic installation
horizontal siding installation
Distance
minus 1/4"
Fig.1
Eave Treatment
The last course of siding will gener-
ally need to be cut to fit the eave 
opening (Fig.1).
Step 1
Install undersill trim under the eave or 
overhang as a receiver for the cut sid-
ing. Undersill trim is used anytime the 
top or bottom lock has been removed 
from the siding. Furring may be need-
ed to maintain face of the panel at the 
desired angle.
Step 2
Measure from the top of the undersill 
trim to the bottom of the upper lock 
on the previous course of panels. 
Subtract 1/4˝. Mark this dimension on 
the panel to be cut, measuring from 
the bottom edge of the panel.
Step 3 
Using a snaplock punch, punch the 
vinyl siding along the cut edge every 
6˝ to 10˝, so the raised lug is on the 
outside face.
Step 4
Install the siding panel, making sure 
the lugs (from snaplock punch) lock 
into the undersill trim.










