Safety Guide & Assembly Instructions PS 73251 PS 73252 PS 73253 We’re Here To Help! Call Toll Free 1-888-752-9782 Customer Service: Monday - Friday, 8:00 A.M. to 5:00 P. M. C.S.T.
SAFETY • This product is intended for single-family residential use only, by children ages two to ten and a maximum weight of 105 pounds. Any recommendation over 10 years of age or 105 pounds exceeds the upper limits specified in the American Society for Testing and Materials (ASTM) Home Playground Safety Standard. In order for PlayStar to comply with the ASTM Standard, we cannot recommend anyone above these limits. • Follow the instructions provided, do not alter its design in any way.
SAFETY InSTAllATIOn: 1. Follow the instructions provided, do not alter its design in any way. 2. Place the equipment on level ground, not less than 6' (1.8m) from any structure or obstruction such as a fence, garage, house, overhanging branches, laundry lines or electrical wires. If the area where you will be installing your playset is not level, you must make it level. 3. Playsets must be anchored to the ground. Follow the anchoring instructions provided with your building kit.
TOOLS REQUIRED Socket Wrench ⁷⁄₁₆", ¹⁄₂" & ⁹⁄₁₆" Socket ⁹⁄₁₆" or Adjust. Wrench Ladder Tape Measure Safety Glasses Drill Saw Horses (Optional) Square Phillips Screwdriver Saw Punch Hammer ¹⁄₈", ¹⁄₄" & ³⁄₈" Drill Bit ³⁄₄" & 1¹⁄₈" Spade Bit Hack Saw Metal File Pencil Tape Chalk HARDWARE INCLUDED (shown actual size) Depending on Design Options, some hardware may not be used.
CONTENTS – Gold Design Option Contents: 1 Small Tower Assembly 2 Play Handles 2 Sandbox Seats 1 large Tower Assembly Picnic Table 2 Play Handles 1 Small Roof Assembly (7 Bds Ea Sd) Front View 2 large Roof Assemblies (7 Bds Ea) 1 Bridge Floor Assembly 2 Bridge Rail Assemblies w/ 2 – 2" x 4" x 60" boards 1 monkey Ring Base Assembly (4 Rocks) 2 monkey Ring Beam Assemblies 1 Swing Beam (10' Left w/ Air Rider Brackets) 1 2" x 4" x 28³⁄₈" board 1 2" x 6" x 65¹⁄₄" board 3 4" x 4" x 96" boards 1 Spiral Tube Slide
CONTENTS – Silver Design Option Contents: 1 Small Tower Assembly 2 Sandbox Seats 2 Play Handles 1 large Tower Assembly Picnic Table 2 Play Handles 2 Roof Assemblies (7 Bds Ea Side) 2 monkey Ring Beam Assemblies 1 Swing Beam (10' Left w/ Air Rider Brackets) 1 1 1 3 1 1 1 1 1 1 1 2" x 6" x 82¹⁄₄" board 2" x 6" x 72¹⁄₂" board 2" x 6" x 65¹⁄₄" board 4" x 4" x 96" boards 2" x 4" x 48" board 2" x 4" x 28³ ₈" board Giant Scoop Wave Slide Scoop Wave Slide Climbing Wall Air Ride (Assembled) Vertical Climber 1 Co
CONTENTS – Bronze Design Option Contents: 1 Front Tower Assembly 2 Sandbox Seats 1 Back Tower Assembly Picnic Table 2 Play Handles 1 Roof Assembly (4 Bds Ea Side) 1 Roof Assembly (7 Bds Ea Side) 2 monkey Ring Beam Assemblies 1 Swing Beam (8' Left) Front View 1 2" x 6" x 65¹⁄₄" board 3 4" x 4" x 96" boards 1 1 1 2 Giant Scoop Wave Slide Scoop Slide Climbing Steps Vertical Climbers 1 Component Box - Includes: 1 Swing Seat Assembly (Yellow) 1 Gym Rings Assembly (Yellow) 1 Telescope 1 Steering Wheel 1 Mega
Items for STeP 1: (1) (1) (1) (2) (2) (20) SMALL TOWER - GOLD Small Tower Assembly 2" x 6" x 82¹ ₄" board 2" x 6" x 72¹ ₂" board ³⁄₈" x 3" lag screws ³⁄₈" washers #8 x 2¹⁄₂" deck screws Lay the tower on its side as shown. Detail from inside. 2" x 6" x 72 2" ¹ ₂" 72¹ ₂" 2"" x 6" x 82 2 82¹ ₄" ¹ ₄" Attach 2" x 6" x 82¹ ₄" board and 2" x 6" x 72¹ ₂" board to the tower as shown. Secure with #8 x 2¹⁄₂" deck screws and ³⁄₈" x 3" lag screws with ³⁄₈" washers as shown.
Items for STeP 3: (2) (2) (4) (12) LARGE TOWER - GOLD Large Roof Assemblies Roof Caps #8 x 2¹⁄₂" deck screws #14 x 1¹ ₄" pan head screws Fig. 1 Fig. 2 90º Position roof assemblies as shown keeping square. Attach roof caps with twelve #14 x 1¹ ₄" pan head screws. (Fig.1) Flip roof assembly as shown. (Fig 2.) Secure with four #8 x 2¹⁄₂" deck screws in predrilled holes as shown.
Items for STeP 5: BRIDGE ASSEMBLY - GOLD (1) Bridge Floor Assembly (16) #8 x 2¹⁄₂" deck screws Lift both towers upright and position in final location as shown. Remove the outermost 5/4" x 6" x 18³⁄₄" boards of the Bridge Floor Assembly. (Fig. 1) Connect Towers with Bridge Floor Assembly at dimensions shown. Secure with #8 x 2¹⁄₂" deck screws above and below the ends of the 2" x 4" x 60" boards. Fig. 1 2" x 4" x 60" Warning: Ground must be level.
Items for STeP 7: (2) 2" x 4" x 60" boards (16) #8 x 2¹⁄₂" deck screws 2" 2" Position 2" x 4" x 60" boards at dimensions shown. Secure with #8 x 2¹⁄₂" deck screws. Details of Screw Placement x 4" x 60 " x 4" x 60 " 80¹|₂" Predrill – 1/8" Dia.
FRONT TOWER ASSEMBLY - SILVER Items for STeP 1: (1) (1) (1) (2) (2) (20) Front Tower Assembly 2" x 6" x 82¹ ₄" board 2" x 6" x 72¹ ₂" board ³⁄₈" x 3" lag screws ³⁄₈" washers #8 x 2¹⁄₂" deck screws Lay the tower on its side as shown. Attach 2" x 6" x 82¹ ₄" board and 2" x 6" x 72¹ ₂" board to the tower as shown. Secure with #8 x 2½" deck screws and 3/8" x 3" lag screws with 3/8” washers as shown.
Items for STeP 2: (1) (4) (4) (8) Roof Assembly ³ ₈" x 3" lag screws ³ ₈" washers #8 x 2¹⁄₂" deck screws Position roof assembly so both sides of roof overhang 4" x 4" boards equally. Secure each corner with two #8 x 2¹⁄₂" deck screws and one ³ ₈" x 3" lag screw with ³ ₈" washer. (See below for detail of screw placement.) Lift tower assembly upright and position in desired location. Caution: Ground must be level. Installation on a hill or incline will create unsafe conditions.
MONKEY RINGS ASSEMBLY - SILVER Items for STeP 4: (2) (2) (4) (4) (16) Monkey Ring Beam Assemblies 2" x 4" x 28³⁄₈" ³ ₈" x 3" lag screws ³ ₈" washers #8 x 2¹⁄₂" deck screws Position Towers approximately six feet apart as shown. Attach 2" x 4" x 28³⁄₈" on each tower directly above Monkey Ring assembly beam as shown. Position Monkey Ring Assemblies as shown. Secure with #8 x 2¹⁄₂" deck screws and ³ ₈" x 3" lag screws with washers.
FRONT TOWER ASSEMBLY - BRONZE Items for STeP 1: (1) (1) (4) (4) (8) Front Tower Assembly Roof Assembly ³ ₈" x 3" lag screws ³ ₈" washers #8 x 2¹⁄₂" deck screws Position roof assembly so both sides of roof overhang 4" x 4" boards equally. Secure each corner with two #8 x 2¹⁄₂" deck screws and one ³ ₈" x 3" lag screw with ³ ₈" washer. (See below for detail of screw placement.) Lift tower assembly upright and position in desired location. Detail of Screw Placement Caution: Ground must be level.
BACK TOWER ASSEMBLY - BRONZE Items for STeP 2: (1) (1) (4) (4) (8) Back Tower Assembly Roof Assembly ³ ₈" x 3" lag screws ³ ₈" washers #8 x 2¹⁄₂" deck screws Position roof assembly so both sides of roof overhang 4" x 4" boards equally. Secure each corner with two #8 x 2¹⁄₂" deck screws and one ³ ₈" x 3" lag screw with ³ ₈" washer. (See below for detail of screw placement.) Lift tower assembly upright and position in desired location. Caution: Ground must be level.
SWING BEAM Items for STeP 1: (1) (1) (1) (4) 2" x 6" x 65¹⁄₄" board Left-hand Sturdy-Frame Connector Right-hand Sturdy-Frame Connector #14 x 1¹⁄₄" pan head screws Position one Left-hand (L) Sturdy-Frame Connector and one Right-hand (R) Sturdy-Frame Connector as shown. Use Connector as a drill guide and drill ¹⁄₈" holes 1" deep into the board. Secure with #14 x 1¹⁄₄" pan head screws.
Items for STeP 3: (1) (1) (1) (1) (7) (14) (7) Laminated Swing Beam with Brackets A-Frame Assembly Sturdy-Frame Brace 4" x 4" x 96" ³ ₈" x 4" hex bolts ³ ₈ washers ³ ₈" lock nuts Lay swing beam on saw horses with the single bracket pointing down as shown. Position the A-frame assembly so that the top post is above the top bracket and the bottom post is below the bottom bracket.
Position the single 4" x 4" post under the single bracket so that the holes of the bracket line up with the holes in the single post. Secure with ³⁄₈" x 4" hex bolts, ³⁄₈" washers and ³⁄₈" lock nuts as shown.
Items for STeP 4: (1) Swing Beam Assembly (1) ³ ₈" x 6" hex bolt (2) ³ ₈" washers (1) ³ ₈" lock nut Shown without roof for easier viewing. Lift Swing Beam Assembly to an upright position and attach to the 4' Tower using ³ ₈" x 6" hex bolt, washers and lock nut as shown.
ANCHORING At locations shown screw Playset Anchors into ground by hand (a long screwdriver will help). Use the anchor as a drill guide and drill a ¹⁄₄" hole 2¹⁄₂" deep into the board. Attach with ³ ₈" x 3" lag screw and ³ ₈" washer. When anchoring at tower locations, back out existing ³ ₈" x 3" lag screw with washer. Screw anchor into ground until loop in anchor lines up with hole in tower. Reinstall lag screw with washer to secure anchor.
Silver Option 5 A 6 4 2 3 Bronze Option 5 6 A 4 2 3 22
SLIDE – Mounting Instructions Scoop Slide - PS 8813 Scoop Wave Slide - PS 8814 Giant Scoop Wave Slide - PS 8816 1. Align Slide at right angle (90˚) to 48" play deck. Lip of Slide should rest on the play deck 1¹ ₂". Using the Slide as a template, mark play deck through the three holes in the Slide. Drill three ¹/₈" holes at marked location. 2. Attach Slide temporarily to play deck with three #14 x 1¹/₄" pan head screws provided. 3.
CLIMBING WALL – Assembly Instructions 1. Align top of Climbing Wall at right angle (90˚). Lip of climbing wall should rest on the play deck 1¹ ₂". Using the Climbing Wall as a template, mark play deck through the three holes in the climbing wall. Drill three ¹⁄₈" holes at marked locations. (Fig. 1) 2. Attach Climbing Wall temporarily to play deck with three #14 x 1¹⁄₄" pan head screws provided. 3. Prepare level area where Climbing Wall touches ground. 4.
CLIMBING STEPS – Assembly Instructions Install the Climbing Steps Assembly to your tower: Position the Climbing Steps Assembly into the 21¹⁄₂" (Bronze) or 16" (Gold) opening of your play deck so that the top surface of the top step is flush with the top surface of the play deck. Push side rails of Climbing Step Assembly forward until they contact the play deck. Note: The steps must be positioned as specified, otherwise a head entrapment or tripping hazard could exist.
USE THE INSTALLATION INSTRUCTIONS AND MOUNTING HARDWARE WHICH ARE SUPPLIED WITH THE FOLLOWING COMPONENTS SPIRAl TuBe SlIDe (PS 8820) AIR RIDeR (PS 7958) COmmeRCIAl GRADe TRAPeZe BAR (PS 7538) SPeAk & SPY meGASCOPe (PS 7838) COMPONENTS - Mounting Instructions SWInG SeAT • GYm RInGS 1. Attach coated ends of chains onto play component using Quick-Link Connectors provided. Tighten securely with an adjustable wrench. 2. Hook uncoated ends of chain onto Swing Hangers provided. 3.
COmmeRCIAl GRADe TRAPeZe BAR 1. Hook uncoated ends of chain onto Commercial Grade Swing Hangers using Quick-Link Connectors included with PS 7576 (purchased separately). Tighten securely with an adjustable wrench. Adjustment Zone 2. Using Quick-Link Connectors, attach the Trapeze Bar and one-link chains onto coated ends of Gym Ring chains. NOTE: The one-link chain must hang under the Trapeze Bar. Tighten securely with an adjustable wrench. 3.
Thank You for choosing PlayStar. Because it is our intention to make this a positive family experience, we have taken great care in preparing this product. Should you have any questions, or if we can assist you in any way, please call our friendly Customer Service Department for immediate action. Please call us Toll Free at 1-888-PlAYSTAR Do not return to the store. (752-9782) Monday through Friday, 8:00 A.M. to 5:00 P. M. C.S.T. Ask for Customer Service.