Technical Specifications
25
Swing Station Assembly
Follow Pages 25-27
21"
30"
93"
2"
x 6
"
x 1
4
4
"
Items for STEP 1:
(2) A-Frame Assemblies
(1) 2" x 6" x 144" board
(4) #8 x 1¹⁄₄" deck screws
Lay out the A-Frame Assemblies 93" apart,
elevated on 3" of scrap lumber. Position one
2" x 6" x 144" board under brackets as shown.
Making sure the assembly is square, hold board
tight against bolts installed in A-Frame Assembly Step 2
and attachwith #8 x 1¹₄" deck screws.
Again use the brackets as a drill guide and drill three ³₈"
holes completely through the 2" x 6" x 144" board as shown.
90˚
Dr
i
l
l
Dri
ll
³|₄"
11¹|₄"
36"
18"
18"
36"
23¹|₄"
³|₄"
2
"
x 6"
x 144"
Items for STEP 2:
(1) 2" x 6" x 144" board
(14) #8 x 2¹⁄₂" deck screws
Position second 2" x 6" x 144" board directly on top of first board and
secure with #8 x 2¹₂" deck screws at dimensions shown.
Shown with 4" x 4"
Post A-Frame
Shown with 4" x 4"
Post A-Frame
Free-Standing










