Technical Specifications

22"
16"
18¹|₂"
16"
3
8¹|₂"
16"
18¹|₂"
16"
37¹|₂"
14"
3"
Mark the top board, on the
bottom edge, at the dimensions
shown.
Drill a ¹⁄₄" hole 2¹⁄₂" deep in the
center of the top board at each
location.
Screw swing hangers into board
by hand (a long screwdriver will
help). Tighten swing hanger until
loop is tight against adjoining board
and swing hanger is positioned as shown.
Drill another ¹⁄₄" hole 2¹⁄₂" deep in
adjoining board through swing hanger
loop and secure each swing hanger
with one ³₈" x 3" lag screw and ³₈" washer.
Front View
20
S
hown with 4" x 4"
Post A-Frame
I
tems for Step 7:
(10) swing hangers
(10) ³₈" x 3" lag screws
(10) ³₈" washers
TURN TO PAGES 28-31 FOR
STURDY FRAME BRACE &
ANCHORING INSTALLATION