Front View Swayback Ara Requirements We're Here To He]p! o Ca:ll Ill l—ree1 888-752-9782 PS 7456 Friday, 8:00 AM. 10 500 F M. CET.
SAFETY S &V &V V5V & » Follow the instructions provided, do not alter its design in any way. « {hus product 1s intended for single-tamely residential use only, by children ages wo to ten and a maximum weight of 105 pounds. Any recommendation ver 10 years of age or 105 pounds exceeds the heavy lifting. upper limits specified in the American Soldierly for Testing and Materials (MAST) Home Playground Satiety Standard.
SAFETY INSTALLATION: . On-site adult supervision is recommendation for children of alf ages. 1. Fallow the instructions provided, do not 2. Only one child, for sate single planned alter its design in any way. seal or single planned activity should 2 Place the piazza on level ground. not be allowed on this set at one dime, vanish less than &' (1.8m) from any structure a maximum weight of 105 pounds for obstruction ssh as a fence. garage.
TOOLS REQUIRED Socket Wrench Drill/Driver 2 ip 63y #2 & #3 Screw Bit e Socket Saw Horses Hack Saw %" o Adjustable Erich Square Metal File Ladder Phillips Screwdriver Peril Tape Measure Hammer Tape Safety Glasses Bit Level Utility Knife/Scissors ¥i" Hex Bit Driver PURCHASE SEPARATELY Exterior Paint Chalk Exterior Stain Floral Arrangements Prefabrication Markers Magnets HARDWARE INCLUDED (shown actual size Additional hardware included Al Quantifies may not be used.
CONTENTS 2 {1y { Design-A-Plaque (1} Gym Ring Assembly (2) Climbing Rope (1) Decorate-A-Hag (1) Sand Box Seat (1) Sturdy Frame Brace (1) | Flag Pole (1) Magnetic Chalk Board (1} Roof Cap {2y Lp lie (1) Play Candies (2) g Discovery Telescope (1) Play set Anchors (6) Costner Brackets (6) Climbing Bars (4) Herakles "Stencil Kit (1} Scoop Slide (1)
Remove Contents From Pallet Note: An effort has been made fo minimize packaging to reduce waste. Some of the materials used fo secure play set {o pallet will be repurposed during set up. Individual boards have been fastened inside per-assembled sections. STEP 1: Remove Component Box. Locate Tory bits supplied within hardware bags. ach Flower Box & Cupola from pallet insinuator bits supplied.
STEP 3: . Cut bands. Remove screws using T-25 bit supplied. Discard board. Cut Zip Tie. Remove swing beam in direction of arrow.
STEP 8: Remove Rock Wall in direction of arrow rotating the top first Remove %" boards from back of Rock Wall using T-20 bit supplied SAVE BOARDS FOR LATER USE STEP 8&: Remove all 4 (four) corner brackets shown using T-20 bit supplied SAVE BRACKETS FOR LATER USE Remove Swing Beam Legs in direction of arrow
STEP 7: Cut band Remove 2 (two) Corner Brackets shown using T-20 bit supplied. SAVE BRACKETS FOR LATER USE Remove 1/4" and Picnic Table in direction of arrow SAVE LATER USE STEP 8: Gently roll Tower to slide off pallet & keep in orientation as shipped.
STEP §: Remove all 8 (eight) 2" X 4" boards from pallet using T-25 bit supplied. ROOF ASSEMBLY Items for STEP 10: (2} Roof Sides (2) Roof Caps (12} #14 x 1%4" pan head screws desk screws On a flat surface position roof sides together as shown. Secure with #8 x 2" deck screws. Position Roof Cap fight against boards as shown. Use Roof Cap as a dill guide and drill 12" holes 1" deep. Keep boards square while attaching Roof Cap to boards with #14 x 1%" pan head screws. (#3 Screw Bit} Turn roof over.
stems for STEP 11: (1) Cupola Template (Pg. 13} (1) Cupola Assembly Set cupola at the desired location. Mark all six edges as shown. (Fig. 1) Remove cupola. Cut out cupola template on facing page. Tape template on the roof, lining up the pencil edges. Locate and mark the four hole locations as shown. Drill 14" holes through the roof. (Fig. 2} Fig. 1 Fig. 2 items for STEP deck screws Align the cupola with the pencil marks.
elms for STEP 13: 1) Hag (1) Flag Pole () phew Helpful Hint: Decorate or customize your flag with fabric markers or paint before placing on flag pole. Insert flag onto the flag pole with swan edge on top as shown. Recurs firmly with the zip tle. Trim the end of the zip tie with scissors flush with the head. Items for STEP 14: At the location shown, dill a %" hole at the top of the roof straight thru (1) Hag Assembly the roof as shown. (Fig.
Items for STEP 15: Position Roof Assembly so both sides of roof overhang tower posts (1) Roof Assembly equally. Secure top comers with two #8 x 212" deck screws, then hex bolt, 32" washers and %" lock nuts. gg g//z boils See Bolt & Screw Placement Detail 2y 3" lock nuts (4) #8x 292" desk screws cure these corners Note: Tower s shown with file on fop and board on bottom I L Bolt & Screw Placement Detail o © s items for : orate tower as shown.
Climbers Assembly totems for STEP 17: 4y Climbing Bars (16} #14 x 194" pan head screws Attach Climbing Bars at dimensions shown. Note: Side with 2” x 4" immediately below play deck Use the bar as a dill guide and drill 12" holes 1" deep into the board. Attach with #14 x 11 pan head screws. Note: Location of your flag may be opposite > i side of roof. 4 48 Ryl items for STEP 44%4" board (8) #8x 2" deck screws Lift tower upright and position in desired location.
items for STEP 19: Attach corner brackets. Position brackets 39" up from bot torn of tower with the long side (Play star logo} of the brackets against the boards and the short side flush with the inside edges as shown. (Fig. 1) Rock Wall Comer Brackets %" x 2" hex blats 5" washers Jock nuts Use brackets as a dill guide and drill 15" holes 1° deep into the boards. B8 X 104" sack scows Attach with #8 x 114" deck screws.
SWING BEAM ASSEMBLY items for STEP 20: (2} Swing Beam legs board {1}y 2"%x 4" x 74" board (8) #8 x 21%" deck screws Position assembly as shown. Note: Rifled ends of the Swing Beam legs at fop. Align the Swing Beam legs so that the outermost points measure 887" as shown. Attach boards at dimensions shown, Secure with #8 x 212" deck screws.
Terns for STEP 21: {2} comer brackets (8) #8x 1" deck screws (2} %5 35" hex bolts hex boils (8) %" washers {4y %" lock news Attach corner brackets. To complete the A-Frame Assembly, flip over as shown and position brackets so that the short side (No Play Star logo} is against the board. Use the bracket as a dill guide and drill 12" holes 1" deep into the board. Attach with #8 X 174" deck screws. Again use the bracket as a drill guide and dill %" holes completely through the boards.
Terns for STEP 22: {1} Swing Beam {1} A-frame Assembly {1} Sturdy-Frame Brace {5y %" x 3%2" hex hols (10} %" washers {5y %" lock news Lay swing beam on saw horses as showroom. {Fig. 1} Position the A-frame assembly so that the top leg is above the top bracket and the bosom leg is below the bottom bracket. Line up the holes in the brackets with the holes in the posts and secure with 3" X 3% hex bolts, 4" washers and lock nuts. {(Fig.
Sep 22 Cont.: Make sure brace is square to bairn. Using the brace as a template, dill a 32" hole completely through beam. {Fig. 3} Secure the Sturdy-Frame Brace to the beam with hex bolt, %" washer and %" lock nut. Fig. 3 items for STEP hex bolt washers Locate the hole on the 2" x 4" board of tower assembly where the Swing Station Assembly will be attached. Position Swing Station Assembly against tower and secure with one %" x 5° hex bolt, %" washers and %" lock nut as shown.
Terns for STEP 24: {1} Swing Beam leg hex bolts {4y %" washers {2y %" lock nuts Position the Swing Bean leg on the single bracket so that the holes of the bracket line up with the holes in the single post as shown. Secure with 34" x 32" hex bolts, 32" washers and %" lock nuts as shown.
Items for STEP 25: Attach 28%" board to Swing Beam leg and tower at dimensions shown. Secure using #8 x 214" deck screws. 28%." board {2} comer brackets {4 #8 x 212" deck craws (8) #8 x 174" deck screws Position comer brackets as shown against the 28%%" board. Use the corner brackets as a drill guide and drill 1" holes 1" deep into the hex bolt board. Attach with #8 x 114" deck screws.
items for STEP 26: Mark and drill four holes on top board as shown. Mark 2 lines on bot torn board as shown. {1} Picnic table 1" Mark lines and drill holes. Mark lines with pencil. Sy items for STEP 27; Align top outer edge 30%2" boards with pencil marks as shown. Attach each board with only 3017 boards one #8 x 212" deck screw in the hole closer fo the {2} #8x 2V2" deck screws outer edge. Board should be able to pivot.
items for STEP 35%:" boards deck screws Attach Board at dimensions shown. Make sure board is level. Secure with #8 x 21%" deck screws. ) Items for STEP 267" boards * {12} #8x 22" deck screws 21 From inside of Swing beam find center of 2'X4"x board. Position board 10 #4" from center (211" apart) as shown. Make sure boards are square. Secure with #8 x 21" deck screws.
items for STEP 30: Attach picnic table shown. Make sure table is centered. Secure with #8 X 212" deck screws {1} Picnic table assembly through the holes per-drilled in Step 26 under decking. (6) #8x 212" deck screws Rotate legs as necessary to make sure table is level and legs are firmly resting on ground from underside of table. Secure with #8 x 212" deck screws through the second holes left open during Step 27. Center Picnic Table Edges resting on ground with LEVEL table. SECURE LEGS.
terns for STEP 31: Attach board at dimension shown. Center board with Picnic Table and {1}y board level with board. Dill 2 (two) 14" holes (4) #8x 21" deck screws on each leg as shown in Inside View below. Secure with #8 x 212" deck screws.
terns for STEP 32: Attach first 237" board flush with and overhanging 1° from the end shown. 237" boards Secure with #8 x 2" deck screws. (16} #8 x 2" deck craws Attach second 237%" board tight against the first one as shown. Secure with #8 x 2" deck screws. Ra peat for other side mirroring boards.
FLOWER BOX Items for STEP 33: Remove the 21%° board from the front of Flower Box. Save the #8x 2" deck screws. Remove board items for STEP 34: @) #8x aok screws Set Flower Box at location Shown 3" above 60", Predicable 15" holes. Secure using #8 x 215" deck screws. Pr-drill %5* holes Items for STEP 35: Helpful Hint: Stencil or customize the face of your Flower Box before reattaching. Reattach the front board.
MAGNETIC CHALKBOARD items for STEP 36: 1) Magnetic Chalkboard Russ head screws Center Chalkboard 26%:" uprights. Secure with 48 x %" truss head screws. Caution: To eliminate finger or head entrapment, aff gaps around chalkboard & flower box or fo the nearest object -~ must meet the following guidelines: “smaller than 14" “between 12" and 3127 *or greater than 87 STENCIL SET INSTRUCTIONS 1. Separate stencil strips into individual letters {fold at perforation to make separating letters easier).
Lle (e elms for STEP 37: 5) Anchors “ X 16" Lag Screw At locations shown sower Play set Anchors into ground by hand (a long screwdriver will help). Use the anchor as a delft guide and drill a 4" hole 1" deep miff the board. Almach will 36" x 1V lag wares and 9" washer. Note: if soil conditions permit anchors 1o be pulled out easily, such as in sandy soil conditions, cementing is required.
DESIGN-A-PLAQUE Items for STEP 38: (1) Design-a-Plaque truss head sowers Plague can be installed horizontal or diagonal. Position plaque at desired location. Secure with #8 x 1" truss head screws. Helpful Hint: Decorate or customize your plagues before placing o your plays set. SUNLIGHT WINDOW ASSEMBLY Items for STEP 39: (1) Sunlight Window (16) #8 x %" truss head screws From the inside of the tower, center Sunlight Window flat in opening as shown. Secure with #8 x 36" truss head screws.
SLIDE Mounting Instructions stems for STEP 40: (1) PS 8813 Scope Slide {3) #14 pan head screws Align Slide at right angle (80°) to 48" play deck. Lip of Slide should rest on the play deck 11%". Using the Slide as a template, mark play deck through the three holes in the Slide. Drill three 2" holes at marked location. Attach Slide temporarily to play deck with three #14 x 1Y4" screws provided. Prepare level area where Slide touches ground that is 1" below surrounding grade.
COMPONENTS Mounting Instructions SWING SEAT « GYM RINGS 1. Attach coated ends of chain onto play component using Quick-Link Connectors provided. Tighten securely with an adjustable wrench. 2. Hook uni coated ends of chain onto Swing Hangers provided. 3. Customize the height of your swing or gym rings anywhere in the Adjustment Zone, to fit your child. Warning: Failure to tighten Quick Links securely could result in injury. 10° minimum spacing is point of alf other rides or stationary objects.
K You for choosing Play Star. Because it is our intention to make this @ positive family experience, we five taken great care in preparing this product. Should you hive any questions, o if we can assist you in any way, please coll our friendly Customer Service Department fi)r immediate action. Do not return to the store. Please call us Toll Free at 1-888-PLAY STAR (752-9782) Mandy through Friday, 8:00 A M. 10 5:00 P, C.S.T. Ask for Customer Services.