User Manual

Table Of Contents
Users Manual of WGS-5225-8UP2SV
35
2.2 Installing the Switch
This section describes how to install your Managed Switch and make connections to the Managed Switch. Please read the
following topics and perform the procedures in the order being presented. To install your Managed Switch on a wall or cabinate,
simply complete the following steps.
2.2.1 Wall Mount Installation
To install the Wall-mount Managed Switch on the wall, simply follow the following steps:
Step 1: It is required 4 holes with 8mm diameter on the wall; the distance between the 2 holes is 230 mm and the line through
them must be horizontal.
Step 2: Install a conductor pipe inside the board hole and flush the edge of the conductor pipe with the wall surface.
Step 3: Screw the bolts into the conductor pipe. The Wall-mount Managed Switch is between bolts and conductor pipe, as
shown below.