WGS-5225-Series Quick Guide
8
4.2 Magnet Installation
To install theWall-mount Managed Switchon a magnetic surface,simplyfollowthe
followingdiagram:
DC Input Range
48-56V
V+
Groun d
SYS
PWR
R.O.
Ring
SFP
9
10
ACTLNK
ACTLNK
1000
100
SFP
9
10
PoE In-use
LNK/ACT
5 731
6 842
PoE
WGS-5225-8P2SV
Managed
Fiber
PoE+
Magnet Mounting
Smart LCD
4.3 DIN-rail Installation
The DIN-rail kit is included in the package. When the wall-mount application for
the Wall-mount Managed Switch needs to be replaced with DIN-rail application,
please refer to the following gures to screw the DIN-rail on the Wall-mount
Managed Switch. To hang up the Wall-mount Managed Switch, follow the steps
below:
Step 1: ScrewtheDIN-railontheWall-mountManagedSwitch.