WGS-4215-Series Quick Guide

6
3.1 Terminal Block Connector Pinout
To install the 3-pin Terminal Block Connector on the Wall-mount Managed Switch,
simply follow the following steps:
Step 1: Insert positive DC power wire into V+, negative DC power wire into V-,
and grounding wire into Ground.
V+
V
-
Ground
Step 2: Tighten the wire-clamp screws for preventing the wires from loosening
and plug into the Wall-mount Managed switch.
Note
1.Thewiregaugeshouldbeintherangefrom12to24AWG.
2. The device must be grounded.
3.2 DC Power Jack
The WGS-804HPT/WGS-4215-8P2S/WGS-4215-16P2S requires DC 48V~56V
power input and WGS-4215-8T/WGS-4215-8T2S requires DC 12~48V power input.
Should you have the issue of power connection, please contact your local sales
representative.
2.1mm
DC Receptacle 2.1mm
DC receptacle is 2.1mm wide that conforms to the WGS-4215 series 2.1mm
DC jack's central post. Do not install any improper power adaptor