User's Manual
Table Of Contents
- Chapter 1. Introduction
- Chapter 2. Hardware Installation
- Chapter 3. Router Management
- Chapter 4. Configuration in Web UI
- Appendix A: Troubleshooting
- Appendix B: Planet Smart Discovery Utility
- Appendix C: Planet DDNS
- Appendix D: Glossary
User’s Manual of WGR-500-4P and WGR-500-4PV
23
2.2.2 Magnet Installation
To install the industrial wall-mount Gigabit router on a magnetic surface, simply follow Figure 2-14 below:
Figure 2-14: Router is magnetically installed
2.2.3 DIN-rail Installation
The DIN-rail kit is included in the package. When the wall-mount application for the industrial wall-mount Gigabit
router needs to be replaced with DIN-rail application, please refer to the following figures to screw the DIN-rail on
the industrial wall-mount Gigabit router. To hang up the industrial wall-mount Gigabit router, follow the steps below:
Step 1: Screw the DIN-rail bracket on the Industrial Router as shown in Figure 2-15.
Figure 2-15: DIN-rail bracket is attached to router