Quick Guide
8
Step 3-1: Screw the bolts into the conductor pipe. The Industrial Router is
between bolts and conductor pipe, as shown below.
V+
Ground
WGR-500-4PV
Managed
PoE+
Magnet Mounting
Smart LCD
Internet
SYS
PWR
PoE-in-Use
LNK/ACT
PoE
WAN/LAN
LAN
USB
4 5321
DC Input Range
48-56V
, 2.6A max.
Figure 4-3: Router is screwed to the wall
Step 3-2: Insert screws into the wall anchors, leaving 2 mm of each screw
exposed. Place the wall-mount slots over the screws and slide the
device down until the screws t snugly into the wall-mount slots. The
industry router can be hung on the wall.
2mm
V+
Ground
WGR-500-4PV
Managed
PoE+
Magnet Mounting
Smart L CD
Internet
SYS
PWR
PoE-in-Use
LNK/ACT
PoE
WAN/LAN
LAN
USB
4 5321
DC Input Range
48-56V
, 2.6A max.
M4 Screw
Figure 4-4: Router is hung on the wall