User Manual

User’s Manual of UPOE-800G/UPOE-1600G/UPOE-2400G
22
Figure 2-2-2: Brackets attaching to the Ultra PoE Managed Injector Hub
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step 3: Secure the brackets tightly.
Step 4: Follow the same steps to attach the second bracket to the opposite side.
Step 5: After the brackets are attached to the Injector, use suitable screws to securely attach the brackets to the rack, as
shown in Figure 2-2-3.
Figure 2-2-3: Mounting the Ultra PoE Managed Injector Hub in a Rack
Step 6: Proceed with steps 4 and 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply
power to your Ultra PoE Managed Injector Hub.