SGS-6341-Series User Manual

Table Of Contents
User’s Manual of SGS-6341 series
Figure 2-6 Place the Managed Switch on the desk
Step 3: Keep
enough ventilation space between the Managed Switch and the surrounding objects.
Step 4: Connect the Managed Switch to network devices.
Connect one end of a standard network cable to the 10/100/1000 RJ45 ports on the front of the Managed
Switch. Connect the other end of the cable to the network devices such as printer servers, workstations,
routers or others.
Connection to the Managed Switch requires UTP Category 5 network cabling with RJ45
tips. For more information, please see the Cabling Specification in Appendix A.
Step 5: Supply power to the Managed Switch.
Connect one end of the power cable to the Managed Switch. Connect the power plug of the power
cable into a standard wall outlet. When the Managed Switch receives power, the Power LED should
remain solid Green.
2.2.2 Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follow the instructions described below.
Step 1: Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step 2: Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the
package. Figure 2-7 shows how to attach brackets to one side of the Managed Switch.
1-18