User Manual

Table Of Contents
User’s Manual of LRP-422CST
2.2 Installing the LRP Managed Switch
This section describes how to install your LRP Managed Switch and make connections to the LRPl Managed Switch. Please
read the following topics and perform the procedures in the order being presented. To install your LRP Managed Switch on a
desktop or shelf, simply complete the following steps.
In this paragraph, we will describe how to install the LRP Managed Switch and the installation points attended to it.
2.2.1 Installation Steps
1. Unpack the LRP Managed Switch
2. Check if the DIN-Rail is screwed on the LRP Managed Switch or not. If the DIN-Rail is not screwed on the LRP
Managed Switch, please refer to DIN-rail Mounting section for DIN-rail installation. If users want to wall-mount the LRP
Managed Switch, please refer to the Wall Mount Plate Mounting section for wall-mount plate installation.
3. To hang the LRP Managed Switch on the DIN-rail track or wall.
4. Power on the LRP Managed Switch. Please refer to the Wiring the Power Inputs section for knowing the information
about how to wire the power. The power LED on the LRP Managed Switch will light up. Please refer to the LED Indicators
section for indication of LED lights.
5. Prepare the twisted-pair, straight-through Category 5 cable for Ethernet connection.
6. Insert one side of RJ45 cable (category 5) into the LRP Managed Switch Ethernet port (RJ45 port) while the other side
to the network device’s Ethernet port (RJ45 port), e.g., Switch PC or Server. The UTP port (RJ45) LED on the LRP
Managed Switch will light up when the cable is connected with the network device. Please refer to the LED Indicators
section for LED light indication.
Make sure that the connected network devices support MDI/MDI-X. If it does not support,
use the crossover Category 5 cable.
7. When all connections are set and all LED lights show normal, the installation is completed.
30