User Manual
15
2.2.2 LRP-201ET Front Panel and LED Indicators
Figure 2-4 shows the front panel of the LRP-201ET.
PWR
PAIR
SYS
BNC
LRP In
RJ45
LNK/ACT
PoE-in-Use
10/100/1000T
LRP-201ET
Extender
Figure 2-4: LRP-201ET Front Panel
System
LED Color Function
PWR Green Lit: Indicates the power is on.
SYS Green
Lit: Indicates the system is working.
O: Indicates the system is booting.
PAIR Green
Lit: Indicates the link is working between LRP-201-KIT.
O: Indicates the link is inactive.
1000Mbps PoE-in-Use Slot
LED Color Function
LNK/ACT Green
Lit: Indicates the link through that port is successfully
established at 10/100/1000Mbps.
Blinks: Indicates that the Switch is actively sending or
receiving data over that port.
PoE-in-Use Orange Lit: Indicates the port is providing 56V DC in-line power.
Button
Button Function
PAIR Press PAIR button during 3 seconds to join another LRP injector.
Reset
Hold the Reset button for about 10 seconds until the PAIR and SYS LEDs
are o, meaning the device has been reset to default setting.
2.2.3 LRP-201ET Bottom Panel
The reset button is found on the bottom panel of the LRP-201ET where Figure 2-5
shows.
Reset
Figure 2-5: LRP-201ET Bottom Panel