User's Manual
Table Of Contents
- 1. INTRODUCTION
 - 2. INSTALLATION
 - 3. SWITCH MANAGEMENT
 - 4. WEB CONFIGURATION
- 4.1 Main Web page
 - 4.2 System
- 4.2.1 Management
- 4.2.1.1 System Information
 - 4.2.1.2 IP Configuration
 - 4.2.1.3 IP Status
 - 4.2.1.4 Users Configuration
 - 4.2.1.5 Privilege Levels
 - 4.2.1.6 NTP Configuration
 - 4.2.1.6.1 System Time Correction Manually
 - 4.2.1.7 Time Configuration
 - 4.2.1.8 UPnP
 - 4.2.1.9 DHCP Relay
 - 4.2.1.10 DHCP Relay Statistics
 - 4.2.1.11 CPU Load
 - 4.2.1.12 System Log
 - 4.2.1.13 Detailed Log
 - 4.2.1.14 Remote Syslog
 - 4.2.1.15 SMTP Configuration
 - 4.2.1.16 Fault Alarm
 - 4.2.1.17 Digital Input/Output
 
 - 4.2.2 Simple Network Management Protocol
 - 4.2.3 RMON
 - 4.2.4 DHCP server
 - 4.2.5 Industrial Protocol
 - 4.2.6 Remote Management
 
 - 4.2.1 Management
 - 4.3 Switching
- 4.3.1 Port Management
 - 4.3.2 Link Aggregation
 - 4.3.3 VLAN
- 4.3.3.1 VLAN Overview
 - 4.3.3.2 IEEE 802.1Q VLAN
 - 4.3.3.3 VLAN Port Configuration
 - 4.3.3.4 VLAN Membership Status
 - 4.3.3.5 VLAN Port Status
 - 4.3.3.6 Private VLAN
 - 4.3.3.7 Port Isolation
 - 4.3.3.8 VLAN setting example:
 - 4.3.3.9 MAC-based VLAN
 - 4.3.3.10 IP Subnet-based VLAN Membership Configuration
 - 4.3.3.11 Protocol-based VLAN
 - 4.3.3.12 Protocol-based VLAN Membership
 
 - 4.3.4 Spanning Tree Protocol
 - 4.3.5 Multicast
 - 4.3.6 MLD Snooping
 - 4.3.7 MVR (Multicast VLAN Registration)
 - 4.3.8 LLDP
 - 4.3.9 MAC Address Table
 - 4.3.10 Loop Protection
 - 4.3.11 UDLD
 - 4.3.12 GVRP
 - 4.3.13 PTP
 - 4.3.14 Link OAM
 
 - 4.4 Quality of Service
 - 4.5 Security
 - 4.6 Power over Ethernet
 - 4.7 Ring
 - 4.8 ONVIF
 - 4.9 Maintenance
 
 - 5. SWITCH OPERATION
 - 6. TROUBLESHOOTING
 - APPENDIX A: Networking Connection
 - APPENDIX B : GLOSSARY
 
User’s Manual of IGS-5225 series 
404 
4.6.6 Port Sequential   
This page allows the user to configure the PoE Ports started up interval time. The PoE Port will start up one by one as Figure 
4-6-1-5 shows. 
Figure 4-6-1-5: PoE Port Sequential Power Up Interval Configuration Screenshot 
The PoE port will start up after the whole system program has finished running. 
The page includes the following fields: 
Object  Description 
•  Sequential Power up 
Option 
Allows user to enable or disable Sequential Power up function.   
•  Sequential Power up 
Interval   
Allows user to configure the PoE Port Start Up interval time.   
•  Sequential Power up 
Port Option 
There are two modes for Starting Up the PoE Port 
By Port: The PoE Port will start up by following Port number. 
By Priority: The PoE Port will start up by following the PoE Priority. 
Buttons 
: Click to apply changes   
: Click to undo any changes made locally and revert to previously saved values. 










