Quick Guide

6
3. Wiring the Power Inputs
The Upper Panel of the Industrial Managed Switch comes with a DC
inlet power socket and one 6-contact terminal block. Please follow the
steps below to insert the power wire.
1.Insert positive/negative DC power wires into Contacts 1 and 2 for
Power1,orContacts 5and6forPower2.
IGS-5225-8P4S/IGS-5225-8P2T2S/IGS-5225-4UP1T2S: 48~56V
DC
Input DC 48-56V
DI0 DI1 DO0 DO1 GND GND
DC1
+
DC2Fault
+
1A@24V
1 2 3 4 5 6
1 2 3 4 5 6
Figure 3-1: IGS-5225-8P4S/IGS-5225-8P2T2S/IGS-5225-4UP1T2S Upper Panel
IGS-5225-4T2S:12~48VDC,24VAC
Input
DC12~48V
AC 24V
DC1
DC2
Fault
V1-V1+ V2+ V2-1A@24V
1 2 3 4 5 6
Figure 3-2: IGS-5225-4T2S Upper Panel