Quick Guide

5
3. Wiring the Power Inputs
The Upper Panel of the Industrial Managed Switch indicates a DC inlet power
socketandconsists of oneterminalblockconnectorwithin6contacts.Pleasefollow
the steps below to insert the power wire.
1.Insert positive/negative DC power wires into contacts 1 and 2 for Power1 or 5,
and6forPower2.
IGS-4215-4P4T/IGS-4215-4P4T2S: DC 48~56V
Input DC 48~56V
V1- V1+
DC1
V2- V2+
DC2
Fault
1A@24V
1 2 3 4 5 6
Figure 3-1: IGS-4215-4P4T/IGS-4215-4P4T2S Upper Panel
2.Tightenthewire-clampscrewsforpreventingthewiresfromloosening.
1 2 3 4 5 6
V1- V1+ V2- V2+
Power 1 Power 2
Note
The wiregauge for the terminal block should be in the rangefrom
12to24AWG.