(V3) User Manual

Table Of Contents
Users Manual of IGS PoE series
40
Step 3: Check whether the DIN-rail is tightly on the track.
Please refer to the following procedures to remove the Industrial Managed PoE+ Switch from the track.
Step 4: Lightly remove the DIN-rail from the track.