User's Manual

14
3. Installation
This section describes the functionalities of the Industrial PoE+ Switch’s
components and guides you to installing it on the DIN-rail and wall. Basic
knowledge of networking is assumed. Please read this chapter completely before
continuing.
Note
This following picture shows the user how to install the device, and
the device is not IFGS-1022HPT.
3.1 DIN-rail Mounting Installation
The DIN-rail bracket is screwed on the Industrial PoE+ Switch when out of factory.
When replacing the wall-mount application with DIN-rail application, Industrial
PoE+ Switch is needed. Please refer to the following gures to screw the DIN-rail
bracket on the Industrial PoE+ Switch. To hang the Industrial PoE+ Switch, follow
the following steps:
Step 1: Screw the DIN-rail bracket on the Industrial PoE+ Switch.