GS-5220-Series (V4) User Manual

Table Of Contents
Users Manual of GS-5220 PoE Series Managed Switch
424
4.10.13 Cable Diagnostics
This page is used for running the Cable Diagnostics.
Press to run the diagnostics. This will take approximately 5 seconds. If all ports are selected, this can take approximately 15
seconds. When completed, the page refreshes automatically, and you can view the cable diagnostics results in the cable status
table. Note that Cable Diagnostics is only accurate for cables of length 7 - 140 meters.
10 and 100 Mbps ports will be linked down while running cable diagnostic. Therefore, running cable diagnostic on a 10 or 100
Mbps management port will cause the switch to stop responding until VeriPHY is complete. The VeriPHY Cable Diagnostics
screen in Figure 4-10-13-1 appears.
Figure 4-10-13-1 VeriPHY Cable Diagnostics Page Screenshot
The page includes the following fields:
Object Description
Port
The port where you are requesting Cable Diagnostics.
Description
Display per port description.