GS-4210-Series (V2) User Manual

Table Of Contents
User’s Manual of GS-4210 Series
30
2. INSTALLATION
This section describes the hardware features and installation of the Managed Switch on the desktop or rack mount. For easier
management and control of the Managed Switch, familiarize yourself with its display indicators, and ports. Front panel
illustrations in this chapter display the unit LED indicators. Before connecting any network device to the Managed Switch, please
read this chapter completely.
2.1 Hardware Description
2.1.1 Switch Front Panel
The front panel provides a simple interface monitoring the Managed Switch. Figure 2-1-1 to Figure 2-1-10 show the front panels.
Front Panel
Figure 2-1-1: GS-4210-8T2S Front Panel
Front Panel
Figure 2-1-2: GS-4210-8P2S Front Panel
Front Panel
Figure 2-1-3: GS-4210-8P2C Front Panel
Front Panel
Figure 2-1-4: GS-4210-16T2S Front Panel