User's Manual

Table Of Contents
65
Users Manual of CS-6306R
The CS-6306R provides chassis grounding post in the lower front chassis, marked as “GND”. Chassis
protection grounding should be properly connected to the rack grounding connector
The ground cabling procedures are listed below:
Step 1 Remove the nuts from the front chassis grounding posts.
Step 2 Wrap one end of the green and yellow grounding cable to the grounding posts.
Step 3 Attach the grounding post nut and tighten well.
Step 4 Attach the other end of the grounding cable to the rack grounding connector.
The grounding cable should be made of a good conductor, and the diameter should be
determined by the possible maximum current that may pass through. Bare conductor cabling
is forbidden.
Ground resistance value: The combined grounding resistance should be less than 1 ohm.
2.2.5 Module Installation
The installation procedure is the same for all modules, as shown below:
Slot 5 or Slot 6 should install with Management Module before powering on the Chassis
Switch; otherwise, the Chassis Switch will not operate normally.
The Chassis Switch supports a maximum of 2 management modules (CS6-MCU) for the
purpose of management redundancy at Slot 5 and Slot 6.
Step 1 Power down the CS-6306R (Hot-swapping is supported by optional modules for the CS-6306R.
However, for better convenience, it is recommended to power down the CS-6306R before installing
the modules, if no module in the Chassis Switch is running.).
Step 2 Ensure proper grounding of the CS-6306R.
Step 3 Loosen the panel fasteners locking back plate counterclockwise and remove the back plate.
Step 4 Align the rail and insert the optional module into the slot; you can use the metal handle on the front
plate of the module to ensure good contact. Then lock the module with panel fasteners in the front
plate.