Quick Guide

10
3.4 Module Installation
Theinstallationprocedureisthesameforallcards,asshownbelow:
Slot 5 or Slot 6 should install with Management Module before
powering on the Chassis Switch; otherwise, the Chassis Switch will
not operate normally.
The Chassis Switch supports a maximum of 2 Management
modules (CS6-MCU) for the purpose of management redundancy
at Slot 5 and Slot 6.
Step 1 Power down the CS-6306R (Hot-swapping is supported by optional
modules for the CS-6306R. However, for better convenience, it is
recommended to power down the CS-6306R before installing the
modules,ifnomoduleintheChassisSwitchisrunning).
Step 2 EnsurepropergroundingoftheCS-6306R.
Step 3 Loosen the panel fasteners locking back plate counterclockwise and
remove the back plate.
Step 4 Align the rail and insert the optional module into the slot; you can
use the metal handle on the front plate of the module to ensure good
contact. Then lock the module with panel fasteners in the front plate.
1
3
3
2
2
Figure 3-3 Inserting the Optional Module into the Slot of CS-6306R