User Manual

Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch
BSP-360
28
Step 6. Connect to PC
After completing the above 6 steps, the BSP-360 are ready for service.
2.2.2 DIN-rail Mounting
This section describes how to install the Renewable Energy Switch. There are two methods to install the
Renewable Energy Switch -- DIN-rail mounting and wall-mount plate mounting. Please read the following
topics and perform the procedures in the order being presented.
Follow all the DIN-rail installation steps as shown in the example.
Step 1: Screw the DIN-rail on the Renewable Energy Switch.