User Manual

Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch
BSP-360
24
Step 2. Install battery
(1) Connect the negative electrode of the battery to the terminal for the negative electrode of the
battery on the BSP-360.
(2) Connect the positive electrode of the battery to the terminal for the positive electrode of the battery
on the BSP-360.
(3) After the battery is well connected to the BSP-360, the PWR LED will be ON and System LED will
slowly blink, and Fault LED will slowly blink for PV not connected.
The BSP-360 accepts the 24V DC battery system. P
characteristics and also refer to the section --
Batteries in the Quick Installation Guide.
Be noted for the thickness of electric wire and please refer to the section --
Recommended Use of the Connected Wires in the Quick Installation Guide.
The default LVD (Low Voltage Disconnection) is set at 22.2V DC;
we suggest charge
the voltage of battery to 23.5V DC or above for the BSP-360.
network device lack of power supply.
Please link PLANET download center and download BSP360-PV&BAT_calculation
.
The calculation list can help you to select solar panel and battery.