User Manual
Table Of Contents
Industrial Renewable Energy 4-Port 10/100/1000T
802.3at PoE+ Managed Ethernet Switch
BSP-360
24
Step 2. Install battery
(1) Connect the negative electrode of the battery to the terminal for the negative electrode of the
battery on the BSP-360.
(2) Connect the positive electrode of the battery to the terminal for the positive electrode of the battery
on the BSP-360.
(3) After the battery is well connected to the BSP-360, the PWR LED will be ON and System LED will
slowly blink, and Fault LED will slowly blink for PV not connected.
The BSP-360 accepts the 24V DC battery system. P
lease pay attention to the battery
characteristics and also refer to the section --
Recommended Settings for Different
Batteries in the Quick Installation Guide.
Be noted for the thickness of electric wire and please refer to the section --
Recommended Use of the Connected Wires in the Quick Installation Guide.
The default LVD (Low Voltage Disconnection) is set at 22.2V DC;
we suggest charge
the voltage of battery to 23.5V DC or above for the BSP-360.
Check the total power consumption of your connected network device before
installation. Improper battery capacity could shorten the battery life or make your
network device lack of power supply.
Please link PLANET download center and download BSP360-PV&BAT_calculation
.
The calculation list can help you to select solar panel and battery.