User's Manual

INSTALLING THE ETEk STAR
FRAmE ONTO AN ETEk AND AN
ETEk2 mARkER

Etek or Etek2 Paintball marker. The following installation
guide can be applied to either marker, but if you have

your Etek/Etek2 marker then you should contact your
nearest Eclipse Service Centre for advice. Full details of
Eclipse Service Centres can be found on pages 50 and
51 of this manual.
De-gas your marker and discharge any stored gas in a
safe direction before proceeding. Remove the loader,
barrel and air tank so that you can comfortably work on
the marker. Disconnect the 1/4” Macroline hosing from
both the elbow attached to the Inline Regulator and the
elbow attached to the OOPS at the base of your existing
grip frame. Remove the Inline Regulator by unscrewing
it from the front regulator mount (FRM) and the marker
should now resemble
FIGURE 1.1
. Using a 5/64” hex key
remove the three countersunk screws from the right
hand side of the rubber grip
(SEE FIGURE 1.2)
and peel
back the rubber grip to reveal the inside of the grip
frame
(SEE FIGURE 1.3)
.
Unplug the solenoid from its connector on the circuit
board, unplug the Break Beam Sensor System (BBSS)
from its connector on the circuit board
(SEE FIGURE 1.4)
.
Using a 1/8” hex key undo and remove both frame
screws by turning them in a counter-clockwise direction
(SEE FIGURE 1.5)
. At this stage your existing frame can
now be removed from the marker body and set aside
for later use, leaving the marker body with the solenoid
assembly still attached as shown in
FIGURE 1.6 ON THE
NExT pAGE.
FIG 1.2FIG 1.1
FIG 1.4 FIG 1.5
FIG 1.3
8.
INSTALLATION