User's Manual

INSTALLATION CONTINUED..
Complete the installation by screwing the Inline
Regulator back into the FRM
(SEE FIGURE 1.27)
and re-

the Inline Regulator and the OOPS body
(SEE FIGURE
1.28).
NOTE: If you suspect that the Macroline hosing that you
are using is damaged, replace immediately.
You have now successfully installed the Etek STAR
Frame onto your Etek/Etek2 marker.
FIG 1.26
FIG 1.27
FIG 1.28
FIG 1.25
13.
INSTALLATION