User's Manual
INSTALLATION CONTINUED..
IMPORTANT: ENSURE BBSS WIRES ARE LINED UP WITH
THE DESIGNATED SLOTS IN THE FRAME PRIOR TO
ATTACHING FRAME TO MARKER BODY.
Carefully thread the solenoid and BBSS wiring
harnesses through the space in the top of the Etek STAR
Frame
(SEE FIGURE 1.16)
. Line up the Etek STAR Frame
so that it can be attached to the marker body, taking
care not to trap any of the wiring harnesses. Refer to
the diagram on page 52 of this manual and select the
correct sized frame screws (dependant on whether you
using a 1/8” hex key attach the Etek STAR Frame to the
marker body
(SEE FIGURE 1.17)
.
NOTE: ALWAYS use the 3/8” length frame screw in the
front screw hole when attaching the Etek STAR Frame to an
Etek or Etek2 marker. The length of the rear frame screw will
vary according to which marker you are installing the frame
to. Please refer to page 52 of this manual, but if you are still
unsure please contact your nearest Eclipse Service Centre.
Continue the installation process by plugging the
BBSS and solenoid wiring harnesses into their relevant
connectors on the Etek STAR Frame Circuit board (see
page 15), bending the wires as shown to ensure that
they do not obstruct the use of the Opto sensor or
micro-switch
(SEE FIGURE 1.18)
. Fit a 9 volt alkaline battery
(type PP3, 6LR61, MN1064) into the recess with the
battery terminals away from you. The positive terminal
(+) should be on the right hand side, nearest to the side
of the frame
(SEE FIGURE 1.19)
. Fit the rubber grip onto
the frame and using a 5/64” hex key attach the six
countersunk screws that hold the rubber grip onto the
grip frame
(SEE FIGURE 1.20 ON THE NExT pAGE).
NOTE: The Etek STAR Frame utilizes a T-Slot mounting
rail as standard. If your chosen ASA Adapter uses
a dovetail, then you will need to install the dovetail
conversion rail included in the Etek STAR Frame kit.
FIG 1.17
FIG 1.16
FIG 1.18
FIG 1.19
11.
INSTALLATION