Manual

THEREISNONEEDTOUNSCREWORREMOVETHEGASPIPE
ASSEMBLYDURINGDAYTODAYUSAGEOFTHEMARKER.
Compressedgasistransferredfromtheframetotheinlineregulator
viagaspipeassembly
(SEEFIGURE9A)
,comprisingofagaspipe
section
1
A
andpipenutsection
B
.Itisessentialthatthisgaspipe
assemblyiscorrectlyinstalledbeforethemarkerissuppliedwith
compressedgas.
Beforeinstallingthegaspipeassembly,firstlyinspecttheo-ringson
thepipeforanydebrisordamage
(LABELLED
C
FIGURE9A)
.Cleaning
orreplacingasnecessary.Alsoinspectthereceiverholesinthe
frame
(SEEFIGURE9B)
andSL4inlineregulator
(SEEFIGURE9C)
forany
debrisordirt,cleaningasnecessary.
Screwthepipesectionintothenutsectionfullybeforeattemptingto
installthegaspipeassemblyinthemarker
(SEEFIGURE9D)
.Insertthe
o-ringendofthepipenutsectionintotheSL4regulatorswivel
(SEE
FIGURE9E)
.Rotatetheswivelandgaspipeassemblytoalignthegas
pipesectionwiththegasportintheframe.
HoldingthepipenutsectioninplaceinsidetheSL4regulator
swivel,screwthegaspipesectionclockwisetoextenditintothe
frame
(SEEFIGURE9F)
.Ifthegaspipeassemblycanslidebackwards
andforwards,thenthepipeisnotfullyinstalledandneedstobe
extendedfurther.
Thegaspipeonlyneedstoberemovedformaintenanceprocedures
thatrequireremovaloftheSL4inlineregulatorortheframe
assembly.
1
The GSL and EGO GSL gas pipe sections are not interchangable.
THE gas THroUgH PiPE
DO NOT REMOVE THE GAS THROUGH PIPE WHEN THE
MARKER IS PRESSURISED.
IF THE GAS PIPE ASSEMBLY IS NOT CORRECTLY
INSTALLED HIGH PRESSURE GAS WILL BE EMITTED.
WARNING
A
C
C
C
B
FIG9A
FIG9B
FIG9C
FIG9F
FIG9D
FIG9E
Using THE gsL 15