Manual
ATTACHING THE FRAME
To install the frame, firstly check the SFR seal is
correctly located in the top of the frame
(SEE
FIGURE 23A),
then carefully thread the solenoid
and the Break Beam Sensor System wiring harnesses
through the access hole in the top of the frame and line
the frame up so that the rear frame screw sits in the
access hole
(SEE FIGURE 23B).
BE CAREFUL NOT TO TRAP OR PINCH THE BBSS OR
SOLENOID WIRES BETWEEN THE BODY AND FRAME.
Slide the frame forward so that it sits completely flush
with the Geo3 body and using the short arm of a 1/8”
hex key, tighten the rear frame screw into place
(SEE
FIGURE 23C).
Check that no wires are trapped before
tightening down the two frame screws.
Insert the front frame screw into its designated position
at the front of the frame and using a 1/8” hex key
tighten it into place
(SEE FIGURE 23D).
Connect the solenoid and Break Beam Sensor System
wiring harnesses to their respective ports on the Geo3
circuit board and
(SEE FIGURE 23E).
Adjust the wires so that they sit neatly in the grip frame
and ensure that the wires do not obstruct either the
micro-switch or the Opto sensor
(SEE FIGURE 23F).
Attach the Geo3 rubber grips to the frame using a
5/64” hex key to replace the 6 grip screws
(SEE
FIGURE 23G).
Screw the inline regulator back into the Front Regulator
Mount and connect any hosing that was disconnected
earlier
(SEE FIGURE 23H).
You have now re-installed the frame onto the Geo3.
FIG 23E
FIG 23F
FIG 23G
FIG 23h
FIG 23b
FIG 23A
FIG 23DFIG 23C
DE-GAS YOUR MARKER, DISCHARGING ANY
STORED GAS IN A SAFE DIRECTION, AND REMOVE
THE BARREL, LOADER, AIR SYSTEM AND ANY
PAINTBALLS TO MAKE THE MARKER EASIER AND
SAFER TO WORK ON.
WARNING
62.
MAINTENANCE