Manual

REMOVING THE FRAME
Removal of the frame is required for access to the
solenoid assembly, trigger bearing carrier assembly and
Break Beam Sensor System wires if maintenance on
either is required.
Disconnect any hosing and unscrew the inline regulator
from the Front Regulator Mount (FRM) as detailed in
the ‘CLEANING THE INLINE REGULATOR’ section of this
Maintenance Guide.
Using a 5/64” hex key, remove the six screws that
attach the Geo3 rubber grips to the Geo3 frame
(SEE
FIGURE 22A).
Unplug the solenoid and the Break Beam Sensor
System wiring harnesses from their respective ports on
the Geo3 circuit board
(SEE FIGURE 22B).
Using a 1/8” hex key, undo and remove the front frame
screw
(SEE FIGURE 22C). Using the short arm of
a 1/8” hex key, loosen the rear frame screw a full turn
(SEE FIGURE 22D). Slide the frame backwards
approximately half an inch so that the rear frame screw
disengages from the frame and remove the frame from
the Geo3 body taking care not to damage any wires
(SEE FIGURE 22E).
You have now removed your Geo3 frame from the Geo3
body.
FIG 22A
FIG 22C
FIG 22b
FIG 22D
FIG 22E
DE-GAS YOUR MARKER, DISCHARGING ANY
STORED GAS IN A SAFE DIRECTION, AND REMOVE
THE BARREL, LOADER, AIR SYSTEM AND ANY
PAINTBALLS TO MAKE THE MARKER EASIER AND
SAFER TO WORK ON.
WARNING
WARNING: IF YOU ARE AT ALL UNSURE AT
PERFORMING THE MAINTENANCE PROCEDURE
PLEASE CONTACT YOUR NEAREST ECLIPSE SERVICE
CENTRE. (SEE PAGE 75)
WARNING
Contents
Orientation
Quick Set-up
Using the Geo3
Menu Tree
Advanced Set-up
Maintenance
Fault Finding
Service Centres
Parts List
Spares
Index
61.
Maintenance
QUICK GUIDE