Manual

CONTINUED
Connect the Solenoid and Break Beam Sensor System
wiring harnesses to their respective ports on the Geo2
Circuit Board and SEE FIGURE 12.10.
Adjust the wires so that they sit neatly in the Grip Frame
and ensure that the wires do not obstruct either the Micro-
switch or the Opto sensor SEE FIGURE 12.11.
Attach the Geo2 Rubber Grips to the Frame using a 5/64”
hex key to replace the 6 grip screws SEE FIGURE 12.12.
Screw the Inline Regulator back into the Front Regulator
Mount and connect any hosing that was disconnected
earlier SEE FIGURE 12.13.
You have now installed your Geo2 Grip Frame onto the
Geo2.
WARNING: IF YOU ARE AT ALL UNSURE AT PERFORMING
THE MAINTENANCE PROCEDURE PLEASE CONTACT
YOUR NEAREST ECLIPSE SERVICE CENTRE. SEE PAGES
6971
FIG 12.10
FIG 12.11
FIG 12.13
FIG 12.12
CONTENTS
ORIENTATION
QUICK SET-UP
USING YOUR GEO2
ADVANCED SET-UP
MENU TREE
MAINTENANCE
FAULT FINDING
SERVICE CENTRES
PARTS LIST
SPARES & ACCESSORIES
E-PORTAL
INDEX
57.
MAINTENANCE
MAINTENANCE
QUICK GUIDE