Manual

ATTACHING THE FRAME
To install the Frame, rstly ensure the solenoid and BBSS
wires are sat in the channel on the left of the body SEE
FIGURE 12.6
. Carefully thread the Solenoid and the Break
Beam Sensor System wiring harnesses through the access
hole in the top of the Frame and line the frame up so that
the Rear Frame Screw sits in the access hole SEE FIGURE
12.7.
BE CAREFUL NOT TO TRAP OR PINCH THE BBSS OR SOLENOID
WIRES BEHIND THE REAR FRAME SCREW OR BETWEEN THE
BODY AND FRAME, BEING UNABLE TO FREELY PULL THE
TRIGGER ALL THE WAY BACK IS A SIGN THE WIRES ARE TRAPPED
BETWEEN THE BODY AND FRAME.
Slide the frame forward so that it sits completely ush
with the Geo2 Body and using the short arm of a 1/8” hex
key, tighten the Rear Frame Screw into place SEE FIGURE
12.8.
1
Insert the Front Frame Screw into its designated position
at the front of the Frame and using a 1/8” hex key tighten it
into place SEE FIGURE 12.9.
1
Check that no wires are trapped before tightening down the two
frame screws.
FIG 12.7
FIG 12.6
FIG 12.9FIG 12.8
WARNING: DEGAS YOUR MARKER, DISCHARGING
ANY STORED GAS IN A SAFE DIRECTION, AND REMOVE
THE BARREL, LOADER AND AIR SYSTEM TO MAKE THE
MARKER EASIER TO WORK ON.
56.
MAINTENANCE