Manual
SETTING UP YOUR GEO2
Before you can begin to use your Geo2, you will need to
attach an air system and a paintball loader.
INSTALLING A PRESET AIR
SYSTEM
Every Geo2 comes complete with an Eclipse On/O Purge
System (OOPS) which provides a direct connection for
a preset air system. Before screwing the air system into
the OOPS ensure that the On/O knob is wound out
approximately half way SEE FIGURE 4.1. Be careful not to
unscrew the On/O knob too far as it will come completely
o the OOPS. If this happens, replace the On/O knob
by screwing it back onto the OOPS body in a clockwise
direction.
1
Screw the preset air system into the OOPS SEE FIGURE
4.2
so that the bottle screws in all the way and is tight.
Slowly turn the On/O knob in a clockwise direction
allowing the OOPS to depress the pin of the preset air
system causing the Geo2 to become pressurised, providing
that there is sucient air in your tank SEE FIGURE 4.3.
You have now installed a preset air system onto your Geo2.
1
High, mid and low pressure output preset air systems can be used
with the Geo2.
WARNING: ALWAYS RELIEVE ALL RESIDUAL GAS
PRESSURE FROM THE GEO2 BEFORE UNSCREWING THE
PRESET AIR SYSTEM.
WARNING: THE GEO2 CANNOT BE USED WITH CO2,
IT CAN ONLY BE POWERED BY COMPRESSED AIR OR
NITROGEN.
FIG 4.3
FIG 4.2
FIG 4.1
WARNING: MAKE SURE THE MARKER IS TURNED OFF
AND THAT NO PAINTBALLS ARE IN THE MARKER OR
LOADER BEFORE INSTALLING AN AIR SYSTEM.
16.
USING yOUR GEO2