Manual
ATTACHiNG THE FRAME
Carefully thread the solenoid and BBSS wires through the
access holes in the top of the Ego LV1 frame
(SEE FIGURE
22A)
. Making sure that the BBSS and solenoid wires are not
trapped between the frame and body, re-attach the frame to
the Ego LV1 body by tightening the two frame screws using a
1/8” hex key
(SEE FIGURE 22B)
.
Ensure that the BBSS cables lie neatly in the slots provided
for them in the frame and re-connect the solenoid and the
BBSS using relevant sockets on the Ego LV1 circuit board
(SEE
FIGURE 22C)
.
Adjust both the solenoid and BBSS wires so that they sit
neatly within the frame, making sure the wires do not interfere
with the OPTO sensors or micro-switch
(SEE FIGURE 22D)
.
Re-attach the Ego LV1 rubber grips to the frame by using a
5/64” hex key to replace the four grip screws.
Reinstall the gas pipe assembly. See page 15.
REMOViNG THE FRAME
Disconnect the gas pipe from the frame (page 15). Using a
5/64” hex key remove the four screws that attach the Ego
LV1 rubber grips to the Ego LV1 frame
(SEE FIGURE 21A)
.
Unplug the solenoid and BBSS wires from their sockets on the
Ego LV1 circuit board
(SEE FIGURE 21B)
.
Using a 1/8” hex key undo the two frames screws
(SEE
FIGURE 21C)
and remove the frame from the Ego LV1 body,
taking care not to damage any wires or the solenoid assembly
(SEE FIGURE 21D)
.
You have now removed the frame.
IF YOU ARE UNSURE ABOUT PERFORMING A MAINTENANCE
PROCEDURE PLEASE CONTACT YOUR NEAREST SERVICE
CENTRE.
WARNING
DE-GAS YOUR MARKER, DISCHARGING ANY STORED GAS IN
A SAFE DIRECTION, AND REMOVE THE BARREL, LOADER, AIR
SYSTEM AND ANY PA INTBALLS TO MAKE THE MARKER
EASIER AND SAFER TO WORK ON.
WARNING
FIG 21A
FIG 21C
FIG 22A
FIG 22C
FIG 21B
FIG 21D
FIG 22B
FIG 22D
52 MAiNTENANCE