Manual

SETTING UP
Before you can begin to use your Eclipse Ego7, there are a
few necessary components that are required to enable the
Eclipse Ego7 to function namely an air system and a loader
of your choice.
INSTALLING A
PRESET AIR SYSTEM
Every Eclipse Ego7 comes complete with an Eclipse On/Off
Purge System (OOPS) allowing a preset regulator and tank
to be screwed straight in for immediate use. Before screwing
the preset into the OOPS ensure that the On/Off knob is
wound out approximately half way (SEE FIGURE 4.1).
Be careful not to unscrew the On/Off knob too far as it will
come completely off the OOPS. If this happens, replace the
On/Off knob by screwing it back onto the OOPS body in a
clockwise direction.
Screw the preset air system into the OOPS (SEE FIGURE 4.2) so
that the bottle screws in all the way and is tight. Slowly turn
the On/Off knob in a clockwise direction allowing the OOPS
to depress the pin of the preset air system causing the
Eclipse Ego7 to become pressurized, providing that there is
Z\MÄJPLU[HPYPU`V\Y[HUR(SEE FIGURE 4.3).
You have now installed a preset air system onto your Eclipse
Ego7.
NOTE: WHEN USING AN OOPS ON YOUR ECLIPSE EGO7,
THE ECLIPSE EGO7 WILL STILL HAVE STORED AIR IN THE
VALVE CHAMBER, GAS LINE AND INLINE REGULATOR
AFTER YOU HAVE SWITCHED THE ECLIPSE OOPS OFF.
PLEASE REMEMBER TO DISCHARGE THE STORED AIR
IN A SAFE DIRECTION AS YOU ARE UNSCREWING THE
ON/OFF KNOB ON THE ECLIPSE OOPS.
NOTE: THE ECLIPSE EGO7 CANNOT BE USED WITH CO2,
IT CAN ONLY BE POWERED BY COMPRESSED AIR OR
NITROGEN.
=@>+%*
=@>+%)
=@>+%(
()%LJ@E>PFLI<>F.