Model #: ___________________________ Serial #: ___________________________ Date Purchased: ____________________ Installation & Operation Manual CRTE: Electric Counter Top Rethermalizer C L20-259, Rev 7 (09/13) UL R U ENGLISH IMPORTANT FOR FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment:
TO THE PURCHASER, OWNER AND STORE MANAGER Please review these warnings prior to posting them in a prominent location for reference. WARNING DO NOT store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. WARNING Improper installation, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this appliance.
INSTALLATION 1. INSTALLATION ................................................................................... 2 1.1. CHECKING YOUR NEW APPLIANCE .......................................................................................... 2 1.2. INSTALLATION CLEARANCES ................................................................................................... 3 1.3. INSTALLATION TO COUNTER .....................................................................................................
INSTALLATION CRTE COUNTER TOP RETHERMAILZER 1. INSTALLATION 1.1. CHECKING YOUR NEW APPLIANCE Your new Pitco appliance has been carefully packed into one crate. Every effort has been made to ensure that it is delivered to you in perfect condition. As you unpack your new appliance, inspect each of the pieces for damage. If something is damaged, DO NOT sign the bill of lading. Contact the shipper immediately; the shipper is only responsible for 15 days after delivery.
INSTALLATION 1.2. INSTALLATION CLEARANCES The clearances shown below are for combustible and non-combustible installations and will allow for safe and proper operation of your appliance. Back Sides Counter Combustible Construction Inches (centimeters) 6.0" (15.24cm) 6.0" (15.24cm) 4.75" (12.07cm) Non Combustible Construction Inches (centimeters) 0.0" (0.0cm) 0.0" (0.0cm) 0.0" (0.0cm) In addition to the above clearances there must also be at least 16 inches (40.64cm) of aisle space in front of the unit.
CRTE COUNTER TOP RETHERMAILZER INSTALLATION 1.5. ELECTRICAL CONNECTIONS It is advised that this power supply be plugged into a wall receptacle that is controlled by the ventilation control. This will prevent the appliance from being operated without the ventilator on. The power requirements for your appliance are listed below. Voltage/Phase KW Amps 200VAC, single phase 5.5 28 208VAC, single phase 6 29 220VAC, single phase 5 23 230VAC, single phase 5.
INSTALLATION Available Power Cords # 1 2 3 4 Description Twist Lock Shrouded Twist Lock Right Angle Straight Blade Pin & Sleeve Standard Hubbell # NEMA L6-30P HBL2621 NEMA L6-30P HBL2621S NEMA 6-30P HBL9331 IEC 309-1 or HBL330P6W IEC 309-2 Mates to HBL2620 HBL2626 HBL9330 HBL330C6W or HBL330R6W Appliance will be shipped with only one power cord from the listing above. 5 L20-259, rev.
CRTE COUNTER TOP RETHERMAILZER INSTALLATION 1.6. VENTILATION AND FIRE SAFETY SYSTEMS Your new appliance must have proper ventilation to function safely and properly. It is very important to install a fire safety system. Your ventilation system should be designed to allow for easy cleaning. Frequent cleaning and proper maintenance of the ventilation system and the appliance will reduce the chances of fire. Ventilation and fire safety systems must comply to local and national codes. Refer to ANSI 83.
INSTALLATION 1.8. INITIAL CLEANING When your appliance is shipped, many of its parts are covered with a thin coat of oil for protection. Before the appliance is ready for cooking it must be cleaned. This will remove the oil coating and any foreign matter that may have accumulated during storage and shipment. Refer to the following procedure to clean the appliance. WARNING Wear protective gloves and clothing when cleaning and draining the appliance and when disposing of water.
OPERATION CRTE COUNTER TOP RETHERMAILZER 2. OPERATION 2.1. FILLING THE APPLIANCE 2.1.1. FILLING THE COOKER TANK It is recommended that the cooker tank is filled with hot water. This will greatly decrease the time it takes for the appliance to reach operating temperature. Refer to the following procedure to fill the cook tank prior to operation. CAUTION This appliance is not designed for cooking with oil. Fill with potable water only. 1.
OPERATION 2.3. COOKING It is important to keep the cook tank full of water to minimize the chance of boiling the appliance dry and to keep the water at a level that will provide optimum cooking performance. To ensure the quality of the food you cook in this appliance, follow the preparation instructions from the food manufacturer. 2.3.1. ADDITIONAL CONTROLLER FUNCTIONS Some controllers have additional functions not described in this manual.
CRTE COUNTER TOP RETHERMAILZER PREVENTATIVE MAINTENANCE 3. PREVENTATIVE MAINTENANCE 3.1. DAILY PREVENTATIVE MAINTENANCE Performing the preventative maintenance steps below on a daily basis will keep your equipment safe and at peak performance. WARNING The power supply must be disconnected 3.1.1.
PREVENTATIVE MAINTENANCE 3.3. ANNUAL/PERIODIC PREVENTATIVE MAINTENANCE AND INSPECTION This section should ONLY be performed by a qualified service technician as part of a regular kitchen maintenance program. This inspection should take place a minimum of once a year by an Authorized Service Technician recommended by Pitco. WARNING The power supply must be disconnected before cleaning and servicing this appliance! 3.3.1. HEATING ELEMENT Check if the element is mechanically sound and in good condition.
CRTE COUNTER TOP RETHERMAILZER TROUBLESHOOTING 4. TROUBLESHOOTING 4.1. POWER FAILURE If electric power is removed for any reason, the appliance will shut down. To restart the appliance, follow the appliance start up procedure in section 2.2. CAUTION DO NOT attempt to operate this appliance during a power outage. 4.2. HIGH TEMPERATURE LIMIT This appliance is equipped with a high temperature limit switch.
TROUBLESHOOTING 4.4.
CRTE COUNTER TOP RETHERMAILZER TROUBLESHOOTING 4.6. PROGRAMMING INSTRUCTIONS L20-259, rev.
TROUBLESHOOTING PROGRAMMING, Cont’d 15 L20-259, rev.
CRTE COUNTER TOP RETHERMAILZER TROUBLESHOOTING THIS PAGE INTENTIONALLY LEFT BLANK L20-259, rev.
TROUBLESHOOTING THIS PAGE INTENTIONALLY LEFT BLANK 17 L20-259, rev.
In the event of problems with or questions about your order, please contact the Pitco Frialator factory at: (603) 225-6684 World Wide Website Address: www.pitco.com In the event of problems with or questions about your equipment, please contact the Pitco Frialator Authorized Service and Parts representative (ASAP) covering your area, or contact Pitco at the numbers listed to the left. MAILING ADDRESS – P.O. BOX 501, CONCORD, NH 03302-0501 SHIPPING ADDRESS – 10 FERRY ST., CONCORD, NH 03301 L20-259, rev.