Pit Boss® Pro Series Manual

ENGLISH
13
17.    
Parts Required:
5 x Screw
(#A)
5 x Locking Washer
(#C)
5 x Washer
(#B)
Installation:
Mount the side burner shelf onto the gas barrel with five washer, locking
washer, and screw.
18.    
Installation:
Secure the side burner valve onto the side burner panel using two pre-
installed screws on side burner valve.
Fasten screws only half-way to allow easier installation in next step.
19.       
Parts Required:
1 x Side Burner Knob Bezel and Knob
(#23)
Installation:
Assemble the knob bezel to have the key hole assemble into the screws of
knob, make sure small end of key hole upward. See 19A
Slide the knob bezel downward to have the small end of key hole touch the
screws and then tighten the screws. See 19B
Place side burner knobs over the side burner valve stem, making certain to
align the flat portion of the stem with the flat portion of the knob. Push
the side burner knob onto the stem until it is firmly seated. See 19C
20.    
Parts Required:
1 x Side Burner Valve
(#11)
Installation:
Remove the pre-installed screws from the side burner. Insert the end
of the side burner into the side burner valve.
Secure the side burner onto the side burner shelf using the pre-
installed screws.
21.    
Parts Required:
1 x Side Burner Grate
(#10)
Installation:
Open the lid of the side burner shelf.
Place the side burner grate into the side table shelf.
17
18
19
1919
20
11
21
10
23