Assembly Instructions

ENGLISH
9
Secure the power cord bracket using the two screws pre-installed on the
rear side of the hopper, above the drop chute plate. Note illustration 4.
5.    
Parts Required:
1 x Lid Handle
(#11)
2 x Lid Handle Bezel
(#10)
Installation:
Remove the pre-installed screws from the lid handle. From inside the
barrel lid, insert one screw to protrude to the outside. Add a bezel on
the screw, then hand-tighten the screw (from the inside) into the lid
handle. Repeat for the other side.
6.   
Parts Required:
1 x Thermometer Kit
(#3)
Installation:
Remove the pre-installed nut from the thermometer. Insert the
thermometer into the hole provided on the top of the lid on the main
barrel, then secure by re-installing the nut from the inside. Rotate the
thermometer so the text is level and upright.
NOTE: If rotation is askew, this will result in incorrect readings.
7.    
Parts Required:
1 x Grease Bucket
(#13)
Installation:
Place the grease bucket on the spout hook on the end of the main
barrel. Ensure it is level to avoid grease spills.
8.    
Parts Required:
1 x Side Shelf
(#16)
3 x Tool Hook
(#17)
1 x Side Shelf Handle
(#19)
1 x Bottle Opener
(#18)
Installation:
Turn the side shelf upside down. On the edge of the side shelf with three
holes, install the tool hooks into each hole along the edge. Tool hooks
will secure to the self-clinching nut that is pre-mounted on the inside.
Next, remove the pre-mounted screws from the side shelf handle. On the
short side with two holes, hand-tighten the screw (from the inside) into
the handle. Repeat for the other end of the handle. Note illustration 8.
5
7
6
8
8