Installation Guide

4 Installation
Before unpacking the carton, ensure that the packing carton is intact and not damaged or
soaked. Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and
contact the supplier.
After unpacking, check items in the carton against the packing list. If any item is missing,
contact the supplier or agent.
Usually, the packing carton contains all items listed in the packing list shown in Table 3-1.
Table 3-1 package list
PN
Qty
PISCES P100
1
SG00852-A003
1
SG00852-A006
1
1.5m
1
TL-SG1005P
1
0.6m
1
E*2
F*2
4