Use and Care Manual

RESTORE BENCH SET
NEED HELP OR ADVICE ON PUTTING THIS KIT TOGETHER? MISSING PIECES?
EMAIL US AT HELP@PIPE-DECOR.COM FOR ANY QUESTIONS
PARTS LIST
370BNCH01
370BNCH02
370BNCH03
370BNCH04
This kit is made of industrial grade authentic pipe. It is coated in oil post production to prevent rust.
The kit should be cleaned and sealed to prevent rusting. See Clean and Seal sheet for more
information on cleaning and sealing your pipe kit or watch the clean and seal video on the listing.
RECOMMENDED
DRILL FOR
INSTALLATION
RECOMMENDED TOOLS
A- 3/4 IN.FLANGES 8
B- 3/4 IN.TEES 4
C- 3/4 IN.6 IN. PIPE 4
D- 3/4 IN.8 IN. PIPE 6
F- WOOD BENCH
included
3/4 IN. SCREWS 16
B
A
C
D
D
A
recommended flange placement
TOP
BOTTOM
INSTALLATION INTO WOOD TOP
1. Put Legs together as shown above.
Hand tightening each flange to the pipe.
2. Screw Legs into table top into the wood, use the drill setting
10 to prevent stripping the wood. No need to pre-drill.
3. You can untighten each flange to help level the table.
TAKING CARE OF YOUR SOLID WOOD TOP
Restore by PIPE DECOR wood tops use a water-based
polyurethane top coat, to protect and add sheen.
Cleaning
Use a damp rag and/or gentle dish soap like Dawn.
Wipe down your table and let it dry.
DO NOT USE
Oil-based cleaners like Murphys oil soap or an
excessive amount of water.